Omaha’s Streetcar Project: A New Era of Urban Transport
In downtown Omaha, a significant transformation is underway as a 30,000-square-foot building takes shape to become the future home for the city’s streetcars. This facility is a crucial element in Omaha’s ambitious streetcar initiative.
Currently under construction, the streetcar maintenance facility represents a $26 million investment. Located east of Eighth Street along Riverfront Drive, the concrete structure will soon serve as the operational heart of the streetcar project.
Omaha Mayor John Ewing emphasized the facility’s importance, stating, “It will be the place where our six vehicles are maintained, washed and repaired. It will also house staff offices and the Streetcars Operations Command Center, helping support the day-to-day operations, safety and reliability of the system.”
The facility is designed with three levels, incorporating a turntable to maneuver the large streetcars into maintenance and washing bays. This setup ensures comprehensive access to all parts of the vehicles for effective servicing.
Eric Miller, the streetcar operations manager, noted that the building is more than halfway completed and is expected to employ 33 individuals, including 16 operators. “I think it’s really starting to look like a real railroad if you look around,” Miller remarked, highlighting his enthusiasm for the project.
The city has partnered with Spain-based Construcciones y Auxiliar de Ferrocarriles to manufacture the six streetcar vehicles. Once launched, the streetcars will operate every 10 minutes during peak hours. Daily service will run from 6 a.m. to 10 p.m., extending until 2 a.m. on Fridays and Saturdays.
Each streetcar will accommodate up to 150 passengers, and all rides will be complimentary when the system begins operation in 2028.
Beyond transportation, the $421 million streetcar project aims to act as a catalyst for urban development. It is expected to drive over $3 billion in new investments in the metro area within 15 years.
From the top floor of the facility, Mayor Ewing surveyed the evolving landscape, pointing out the CHI Health Center and Eppley Airfield expansions. “I always say it’s going to be great in 2028,” Ewing commented, envisioning a bright future for Omaha.
“`



